Construction Work on New Changing Rooms (4/7/2005 - )

[Page 1] [Page 2] [Page 3]


24th February 2006 - The front of the rooms taking shape towards the end of February, the outer doors are in place, and the roof is complete

24th February 2006 - The showers in some of the the rooms are fully tiled and have flooring laid, and you can see the fittings for the 5 showers per room.

24th February 2006 - The layout of one of the two impaired mobility rooms where there is more changing space, and easier access to wc and shower facilities.

3rd April 2006 - The side entrance complete with a ramp for wheelchair access.

3rd April 2006 - The front view of the building, with the new path linking the clubhouse with the changing rooms.

6th April 2006 - The whole building is state of the art, with automatic lighting, under-floor heating and combination entry locks on the away changing rooms (pictured).

6th April 2006 - The boiler room, needing enough power to supply underfloor heating to 12 rooms and enough hot water to supply a total of over 50 showers.

6th April 2006 - The layout of the standard changing rooms (of which there are 8) looking towards the door, complete with benches.

6th April 2006 - And in the other direction where you can see the end of the main room in the foreground, the wc and wash room in the middle-ground, and the shower room.

6th April 2006 - The view of the main corridor looking back down towards the Grocers side entrance of the rooms.